Italiano

img-PMA release notes

Current version: 0.9 – 30 October 2026

Version Beta 0.9

30 October 2026

Upgrade to PHP 8.5 and overall increase in system security: new login page, projects visible only to authorised users and protection of uploaded documents; assignment of projects to individual users; new Phase Report with Word and PDF export and storage of the signed report; new Home page with project map and campaign status; redesigned panels, tables and buttons; site perimeter drawn on the project map, shown on all maps and in printed reports, with zoom fitted to the perimeter and sampling points.

Version Beta 0.8

17 July 2026

New Schedule with planning of the AO, CO and PO phases, Gantt chart and campaign entry; new Site inspections and events page with attachments and images.

Version Beta 0.7

7 April 2026

Validation of monitoring campaigns and new Campaign Report with A4 layout and printing.

Version Beta 0.6

23 December 2025

Management of campaign Non-Conformities; thematic conformity maps by component and time charts of the results.

Version Beta 0.5

12 September 2025

Bulk upload of campaign data from Excel files, data export and upload of Test Reports.

Version Beta 0.4

2 June 2025

Reporting system to flag deadlines and non-conformities at every level.

Version Beta 0.3

22 March 2025

User profiling system with 4 account types, with different read and write privileges on the portal.

Version Beta 0.2

8 January 2025

Numerical data can be entered for each monitoring campaign for the subsequent conformity check.

Version Beta 0.1

1 November 2024

First public release of the img-PMA application for the System functionality Test phase: portal access, editing of Project data, positioning of sampling points and definition of monitoring campaigns.

Upcoming releases

The next development versions of the portal will introduce several improvements on both the User and the Server side.